About the project

Project Date:

10 Nov 2024

Energy Generation:

296 MW Solar Power Installed

Category:

Solar Energy

Client / Company:

Adani Green Energy Ltd.

Project Location:

Fatehgarh, Rajasthan

Project Information

Kishan Infrastructure Industries Pvt. Ltd. proudly contributed to one of India’s largest solar parks—Adani Fatehgarh—with a total capacity of 296 MW. Situated in the sun-rich region of Fatehgarh, Rajasthan, this mega-scale solar project is part of Adani Green Energy’s nationwide clean energy initiative. KIIPL’s scope in this massive ₹7.65 Cr engagement involved critical civil, structural, and EPC services for a substantial portion of the solar park.

The Adani Fatehgarh solar project is a shining example of public-private collaboration for sustainable energy transition. With the ability to generate approximately 475 million units of green electricity annually, the plant significantly contributes to India’s renewable energy targets while reducing dependence on fossil fuels.

This project also addresses the increasing electricity demand in Rajasthan and helps stabilize the grid with clean energy input. KIIPL was selected for its proven track record in executing high-volume solar infrastructure projects with precision and speed.

Project Scope

KIIPL's responsibilities in the Adani Fatehgarh project included civil infrastructure, module mounting system installation, and DC cabling across a vast area. The terrain was prepared with advanced land development techniques, ensuring an even and erosion-free base for solar panel installation.

We executed structural engineering for mounting 296 MW of solar modules, including hot-dip galvanized steel frameworks, pile driving, and anchoring. The project included handling logistics of heavy structures, safety installations, and dust mitigation techniques in the desert environment.

Our electrical work involved string-level DC wiring, termination at inverters, and connection to combiner boxes, all under the compliance of IEC, MNRE, and Adani Group specifications. Despite its large scale, the project was completed within strict deadlines and with rigorous safety compliance.